The work involves the demolition of the existing indoor pools and changing rooms, the restructuring of the outdoor pools and the construction of two new buildings with pools linked by a building integrating the hall and the changing rooms.
In the Northeast, a new covered pool (25m), for sporting purposes, will offer 8 water lines and one with a depth for synchronised swimming.
In the West, a new building, with 3 pools, will replace the old one. It will be in direct connection with the pool covered by a gallery. The Olympic pool (set to competition standards) and the diving pool (3 diving boards from 1m to 5m) benefit from renovated areas and a solarium is open onto grassland.