Restructuring of the Watersports Stadium

Demolition and restructuring works according to a High Environmental Quality approach.

The work involves the demolition of the existing indoor pools and changing rooms, the restructuring of the outdoor pools and the construction of two new buildings with pools linked by a building integrating the hall and the changing rooms.

In the Northeast, a new covered pool (25m), for sporting purposes, will offer 8 water lines and one with a depth for synchronised swimming.

In the West, a new building, with 3 pools, will replace the old one.  It will be in direct connection with the pool covered by a gallery.  The Olympic pool (set to competition standards) and the diving pool (3 diving boards from 1m to 5m) benefit from renovated areas and a solarium is open onto grassland.

Le projet en image

Année de livraison
2018
Secteur d'intervention
Travaux
Maître d'œuvre
Jean Guervilly – Saint-Brieuc
Maître d'ouvrage
Communauté d'agglomération Caen La Mer